Saturday, May 31, 2014

Wait, 7


The earth comes back mist

of fine rock dropped
through the atmosphere from the drivers in orbit.














 

Thursday, May 29, 2014

Wait, 6


Grinding the bedrock to dust

in the sky above our heads.















 

Wednesday, May 28, 2014

Wait, 5


Scaling barges fulgurate 
into the sky, to the zeppelin crucibles, 

ferrying the planet's core .
















Tuesday, May 27, 2014

Wait, 4


We long ago discovered that 
our ore is easier processed in 

the outer atmosphere, at low gravity.





















Sunday, May 25, 2014

Wait 2


We have whiskey. Also gambling, and family.

Labor issues. Traffic. Small problems.














Thursday, May 22, 2014

Wait


Back home on Kalkovac, we harvest 

ore, turnips.

Harsh wheat.
















 

Tuesday, May 20, 2014

Intermission 3


Let's return to 
the real heart of this chronicle;

infantry, and revolution.















Monday, May 19, 2014

Intermission 2


Enough about drones-

washing machines, circuit
 boards, and 

magnetic tape.











 

Friday, May 16, 2014

Forty Days of Robots: Day 40


The Hess 71-B Mobile Processor And Diagnostic Assembly (MPADA). 

An advanced unit active in very limited numbers, the Hess 71-B MPADA was deployed by the 302nd in the capacity of archiving and monitoring exploration and map making operations in asperous, high nitrogen environs.
 
About 975 on Farlang 23, along the Polar Belt; Ghuani System.
Voyage of the Garden of Hiber, Year Three.




Thanks, Greg!
















Thursday, May 15, 2014

Wednesday, May 14, 2014

Forty Days of Robots: Day 38


A Warkon SD-11, mobile primary steam transfitting unit for troops concerned with water generating influence. Of the greatest utility in arid to semi-arid climates.
















Monday, May 12, 2014

Forty Days of Robots: Day 36


Temperance Differation Unit, a Model 12. These units are commonly modified from their original performance guidelines to calculate targeting arrays, a prevelant but non-regulation procedure.

Time and location of this photopic are unverified.














 

Friday, May 9, 2014

Forty Days of Robots: Day 32


They can be purloined, rewired, and sent back against us without us being any wiser.


Bio-cooked DTX Amsterdam Model 21 in attack mode, Tesulon Station, 929.

Voyage of the Gabion Orchard, Year Two.














 

Monday, May 5, 2014

Sunday, May 4, 2014

Saturday, May 3, 2014

Forty Days of Robots: Day 26


But they're expensive, and much more difficult to produce then soldiers are.

They break when it gets windy, or too dry, or too cold.














Friday, May 2, 2014

Forty Days of Robots: Day 25


The truth is, a long time ago we all thought we might send the robots to fight our wars.















 

Thursday, May 1, 2014